Angle Iron Install at 715 & 719 Eleanor
After all the work of drilling holes in all the angle iron pieces, we are [...]
After all the work of drilling holes in all the angle iron pieces, we are [...]
The installation of the insulation (say that five times...) went without a hitch and passed [...]
One of the nicest features of our urban infill homes is the ability to develop unique [...]
Our HVAC contractor passed his rough in inspection and our engineer signed off on all [...]
Our plumber has just finished working on our gas lines for 715 & 719 Eleanor Avenue. [...]
Our electrician passed his rough in inspection on his first attempt. Way to go Ramiro! [...]
I just wanted to post this 5 second video showing the setting of the 6" [...]
The first floors of 715 & 719 has been completed, with the joists set. I [...]
We are all super excited that the lumber has been dropped off and the framing [...]
After the framing was completed, we added the roof membrane and shingles and wrapped the [...]