3707 Colter Hits the Market
Even though completion is 2-3 months out, we have decided to put this listing on [...]
Sheetrock Starting at 3707 Colter
Since our insulation and framing inspections passed, we had our sheetrock materials delivered and started [...]
Angle Iron Install at 715 & 719 Eleanor
After all the work of drilling holes in all the angle iron pieces, we are [...]
Insulation Completed and Passed Inspection at 3707 Colter
The installation of the insulation (say that five times...) went without a hitch and passed [...]
Angle Iron for Parapet Walls
One of the nicest features of our urban infill homes is the ability to develop unique [...]
Framing and HVAC Inspections Passed at 3707 Colter
Our HVAC contractor passed his rough in inspection and our engineer signed off on all [...]
Ready for Gas Rough In Inspection
Our plumber has just finished working on our gas lines for 715 & 719 Eleanor Avenue. [...]
Plumbing Top Out Completed
Our master plumber passed the top out inspection today on his first attempt, as usual. [...]
Colter Electrical Rough In Passed Inspection
Our electrician passed his rough in inspection on his first attempt. Way to go Ramiro! [...]
715 Eleanor Steel Beams Set
I just wanted to post this 5 second video showing the setting of the 6" [...]
Framing Continues at 715-719 Eleanor
The first floors of 715 & 719 has been completed, with the joists set. I [...]
Framing Starting at 715 719 Eleanor
We are all super excited that the lumber has been dropped off and the framing [...]
Colter Dry In Completed
After the framing was completed, we added the roof membrane and shingles and wrapped the [...]
Foundation Pour
The day has finally arrived, the weather cleared up and we can now schedule our [...]
Colter Framing Almost Complete
After much work, the framing is just about completed at 3707 Colter. Getting excited to [...]
Temporary Meter Loop Set
Our electrician has setup the TML pole and we are now waiting for CPS Energy to [...]
Plumbing Rough In and Forms Starting
A week has gone by since clearing and grading the land and we are all [...]
Excited to Grade the Property
Very excited to start grading the property in order to get it ready for the [...]