3707 Colter New Interior Renderings
Now that we are further along in the construction, we have finalized the selection of [...]
Now that we are further along in the construction, we have finalized the selection of [...]
The sheetrock crew has completed their work at 3707 Colter. We are now scheduling with [...]
We are all very excited to see all the sheetrock go up at 3707 Colter [...]
Even though completion is 2-3 months out, we have decided to put this listing on [...]
Since our insulation and framing inspections passed, we had our sheetrock materials delivered and started [...]
The installation of the insulation (say that five times...) went without a hitch and passed [...]
Our HVAC contractor passed his rough in inspection and our engineer signed off on all [...]
Our master plumber passed the top out inspection today on his first attempt, as usual. [...]
Our electrician passed his rough in inspection on his first attempt. Way to go Ramiro! [...]
After the framing was completed, we added the roof membrane and shingles and wrapped the [...]