ARI Development International https://ari-development.com Tue, 19 Jan 2021 22:29:38 +0000 en-US hourly 1 https://wordpress.org/?v=5.6.17 715-719 Eleanor Interior Trim Work Complete https://ari-development.com/715-719-eleanor-interior-trim-work-complete/ Sat, 31 Oct 2020 15:51:53 +0000 https://ari-development.com/?p=2237

All of the interior trim woodwork is now complete. Baseboard, case molding, closets, etc have all been completed. The carpenters did a fantastic job! Just look at the master closet (which will look like a million bucks when painted), pantry and even the secondary bedroom closets.

]]>
715 719 Eleanor Interior Trim https://ari-development.com/715-719-eleanor-interior-trim/ Tue, 20 Oct 2020 20:35:32 +0000 https://ari-development.com/?p=2207

Our interior trim material for doors, molding and closets has arrived and our carpenter has already started the install. We are so excited to see the interior of the house take shape!

All the doors are solid core for heft, quality and soundproofing and the ones on the ground floor are a full 8′ tall. If we used a standard door, it would look silly with your high 10′ ceilings!

]]>
715-719 Eleanor Sheetrock Texture Completed https://ari-development.com/715-719-eleanor-sheetrock-texture-completed/ Mon, 19 Oct 2020 18:28:42 +0000 https://ari-development.com/?p=2187

The sheetrock is now completely installed, the tape and float finished and the texture has been applied. In fact, over the weekend, the painters painted the ceilings of the houses. Very excited to see the interior take shape like this

]]>
715-719 Eleanor Shingle Roof Completed https://ari-development.com/715-719-eleanor-shingle-roof-completed/ Mon, 19 Oct 2020 18:20:23 +0000 https://ari-development.com/?p=2173

Our shingle roofer completed the shingle install at the back of the houses. We have a roof made up of 2 types. The flat roof that is used as our roof deck and a shingle roof that is used on the sloped back section of the house.

We needed to wait until the stucco was finished at the roof level in order to place the shingles. We had it waterproofed with a strong membrane up until now.

It looks fantastic!

]]>
Tape and Float at 715-719 Eleanor https://ari-development.com/tape-and-float-at-715-719-eleanor/ Tue, 13 Oct 2020 21:47:08 +0000 https://ari-development.com/?p=2092

From the 1st joint that is being taped to the completed multi step process to seamlessly join sheetrock, our tape and floaters have completed their task and the house looks wonderful. Next step is having texture applied to the sheetrock.

]]>
715 719 Eleanor Stucco https://ari-development.com/715-719-eleanor-stucco/ Mon, 12 Oct 2020 22:10:47 +0000 https://ari-development.com/?p=2126

Our stucco crew got started on the houses today, looks like a lot of progress so far and we are hoping that all the exterior stucco can be finished this week, so the beautiful brick can be installed.

]]>
Extra Steps Our Builder Takes https://ari-development.com/extra-steps-our-builder-takes/ Fri, 09 Oct 2020 19:52:39 +0000 https://ari-development.com/?p=2078

This is a hard post to explain, but let me try. Most builders or people in general do not really care if the sheetrock’s distance to the window is exactly the same on both sides. But our builder does. He takes the extra effort to make sure that the window is exactly centered and straight on both sides.

It is hard to see them, but if you look to the left, you can see the shims in the wall to the left of the window.

Thanks Nathan!

]]>
Sheetrock Started at 715 719 Eleanor https://ari-development.com/sheetrock-started-at-715-719-eleanor/ Fri, 09 Oct 2020 19:37:18 +0000 https://ari-development.com/?p=2048

Our sheetrock crew started quickly and got almost all of the sheetrock up already. Sheetrock is a messy job, with lots of cut pieces and trash left on the floor as these photos indicate. There is a separate crew that works on the tape and float of the sheetrock joints which is already starting in some areas

]]>
Sound Insulation at 715-719 Eleanor https://ari-development.com/sound-insulation-at-715-719-eleanor/ Tue, 06 Oct 2020 17:03:10 +0000 https://ari-development.com/?p=2029

After finishing the foam insulation, we had our insulation contractor put in sound insulation between the bedrooms and bathrooms. Just a little extra that nobody will ever see, but believe me, they will be grateful for this extra step. We want to try to make the bedrooms as quiet as possible and adding this insulation in the interior walls will provide joy for everyone’s ears!

]]>
Foam Insulation at 715-719 Eleanor https://ari-development.com/foam-insulation-at-715-719-eleanor/ Thu, 24 Sep 2020 16:54:45 +0000 https://ari-development.com/?p=2007

The city gave us the OK on the firewall, so we can now start the foam insulation on the exterior walls. We are using foam for this project in order to tightly seal the air flow into the house and to provide superior insulation values in the exterior walls and roof.

All OSHA standards were met during the application of the foam. Safety first!

]]>